Work elements included minor demolition and strip out works, site preparation and installation of foundations and reinforced concrete ground floor slab, erection of structural steel frames, cladding and roof; installation of roller shutter doors and glazing together with Internal finishing and fit out works; external works including extending existing hardstanding and access areas, foul and surface water drainage.